Skip to content

Command A vs Command A+

Command A (Cohere) and Command A+ (Cohere) are listed at different prices. Command A+ costs less: $0.30 per 1M input tokens and $1.50 per 1M output tokens, against $2.50 and $10.00 for Command A. Command A has the larger context window, 256,000 tokens against 192,000 for Command A+. Command A+ can write up to 64,000 tokens in one response, against 8,192 for Command A. Command A accepts text and produces text; Command A+ accepts text and images and produces text.

Cohere: Command A accepts and produces text, supports tools, structured outputs, and response formats, and has a 256,000-token context window with up to 8,192 output tokens. Cohere: Command A+ also supports reasoning, accepts text and images, and has a 192,000-token context window with up to 64,000 output tokens.

Compared from catalog data checked

Command A

$2.50 in
$10.00 out
256K context

Command A+

$0.30 in
$1.50 out
192K context

Side by side

0.00 the better figure in a row
Command A and Command A+ specifications side by side
SpecificationCommand ACommand A+
Maker Cohere Cohere
Added to catalog 13 Mar 2025 22 Sep 2026
Input, per 1M tokens $2.50 $0.30
Output, per 1M tokens $10.00 $1.50
Cached input read, per 1M n/a $0.15
Context windowTokens 256,000 192,000
Max outputTokens 8,192 64,000
Accepts text image, text
Produces text text
Tool calling Yes Yes
Structured outputs Yes Yes
Reasoning effort control No No

List prices through OpenRouter, in US dollars. Each model's page has its variants, price history and sample outputs.

What the same task costs

List price for one request, from the token counts shown. The same four tasks are priced on every model page.

Check the provider's pageToken counts are estimates, and the two models count tokens differently.
Cost of the same task on Command A and Command A+
TaskCommand ACommand A+
Answer a short question500 in / 300 out $0.0043 $0.0006
Summarise a 50-page PDF25,000 in / 800 out $0.071 $0.0087
Review a 2,000-line source file30,000 in / 2,000 out $0.095 $0.012
Read a 300-page contract set150,000 in / 1,500 out $0.390 $0.047

Which to choose

Choose Command A if

  • You need the larger context window: 256,000 tokens against 192,000
Command A details

Choose Command A+ if

  • Input tokens cost less: $0.30 against $2.50 per 1M
  • Output tokens cost less: $1.50 against $10.00 per 1M
  • Cached input costs less: $0.15 against n/a per 1M
  • You need longer answers in one response: 64,000 tokens against 8,192
  • It has to read images, which the other model does not
Command A+ details

Neither maker's quality claims are repeated here. The reliable test is your own task: ask both the same question and read the two answers.

Comparison questions

Is Command A cheaper than Command A+?

No, Command A+ is the cheaper of the two. Command A costs $2.50 per 1M input tokens and $10.00 per 1M output tokens; Command A+ costs $0.30 and $1.50 as checked on 22 Nov 2026.

Which has the larger context window, Command A or Command A+?

Command A, at 256,000 tokens against 192,000 for Command A+.

Which is better for coding, Command A or Command A+?

This page does not rank models on quality, and it does not repeat either maker's claims. The table shows what each accepts, supports and costs; the reliable test is your own task: give both the same piece of code and compare the answers.

Can I use both Command A and Command A+?

Command A+ can be chosen in the Upend chat today; Command A is listed in the catalog but not offered in the chat.

Put the same question to both.

Open the chat with one, then switch model and ask again.

Sign in to Upend

Use an account you already have, or get a one-time code by email.

Use a password instead

For accounts that already have a password. Forgotten it? An emailed code signs you in just the same.