Skip to content

Step 3.7 Flash vs Step 5 Preview

Step 3.7 Flash (StepFun) and Step 5 Preview (StepFun) are listed at different prices. Step 3.7 Flash costs less: $0.20 per 1M input tokens and $1.15 per 1M output tokens, against $1.00 and $2.70 for Step 5 Preview. Step 5 Preview has the larger context window, 1,000,000 tokens against 262,144 for Step 3.7 Flash. Step 3.7 Flash can write up to 230,400 tokens in one response, against 64,000 for Step 5 Preview. Both accept text, images and video and produce text.

StepFun: Step 3.7 Flash and StepFun: Step 5 Preview both accept text, images, and video, produce text, and support tools, structured outputs, response formats, and reasoning. Step 3.7 Flash has a 262,144-token context and 230,400-token output limit; Step 5 Preview has a 1,000,000-token context and 64,000-token output limit.

Compared from catalog data checked

Step 3.7 Flash

$0.20 in
$1.15 out
262K context

Step 5 Preview

$1.00 in
$2.70 out
1M context

Side by side

0.00 the better figure in a row
Step 3.7 Flash and Step 5 Preview specifications side by side
SpecificationStep 3.7 FlashStep 5 Preview
Maker StepFun StepFun
Added to catalog 28 May 2026 8 Oct 2026
Input, per 1M tokens $0.20 $1.00
Output, per 1M tokens $1.15 $2.70
Cached input read, per 1M $0.04 $0.10
Context windowTokens 262,144 1,000,000
Max outputTokens 230,400 64,000
Accepts image, text, video image, text, video
Produces text text
Tool calling Yes Yes
Structured outputs Yes Yes
Reasoning effort control Yes Yes

List prices through OpenRouter, in US dollars. Each model's page has its variants, price history and sample outputs.

What the same task costs

List price for one request, from the token counts shown. The same four tasks are priced on every model page.

Check the provider's pageToken counts are estimates, and the two models count tokens differently.
Cost of the same task on Step 3.7 Flash and Step 5 Preview
TaskStep 3.7 FlashStep 5 Preview
Answer a short question500 in / 300 out $0.0004 $0.0013
Summarise a 50-page PDF25,000 in / 800 out $0.0059 $0.027
Review a 2,000-line source file30,000 in / 2,000 out $0.0083 $0.035
Read a 300-page contract set150,000 in / 1,500 out $0.032 $0.154

Which to choose

Choose Step 3.7 Flash if

  • Input tokens cost less: $0.20 against $1.00 per 1M
  • Output tokens cost less: $1.15 against $2.70 per 1M
  • Cached input costs less: $0.04 against $0.10 per 1M
  • You need longer answers in one response: 230,400 tokens against 64,000
Step 3.7 Flash details

Choose Step 5 Preview if

  • You need the larger context window: 1,000,000 tokens against 262,144
Step 5 Preview details

Neither maker's quality claims are repeated here. The reliable test is your own task: ask both the same question and read the two answers.

Comparison questions

Is Step 3.7 Flash cheaper than Step 5 Preview?

Yes, Step 3.7 Flash is the cheaper of the two. Step 3.7 Flash costs $0.20 per 1M input tokens and $1.15 per 1M output tokens; Step 5 Preview costs $1.00 and $2.70 as checked on 22 Nov 2026.

Which has the larger context window, Step 3.7 Flash or Step 5 Preview?

Step 5 Preview, at 1,000,000 tokens against 262,144 for Step 3.7 Flash.

Which is better for coding, Step 3.7 Flash or Step 5 Preview?

This page does not rank models on quality, and it does not repeat either maker's claims. The table shows what each accepts, supports and costs; the reliable test is your own task: give both the same piece of code and compare the answers.

Can I use both Step 3.7 Flash and Step 5 Preview?

Neither is offered in the Upend chat today. Both are listed in the catalog through OpenRouter, with the figures shown here.

Find the model for your task.

Every comparison is computed from the live catalog.

Sign in to Upend

Use an account you already have, or get a one-time code by email.

Use a password instead

For accounts that already have a password. Forgotten it? An emailed code signs you in just the same.